Daily Log October 19, 2011
Who was on site
Doug P, Mike M, D.J.Saari, Lyle H, Rick D, Dorothy B, Janice and Steve H, Jim B and
Vince

What Happened
More vapour barrier, and taping it and acoustical caulking.


What next
More drywall, more drywall and then more drywall

Still Needed
Kitchen finals, Paint colours and trim. We have finalized a kitchen contractor.
A shade for floor colour.

Volunteers
The usual suspects to continue the ceilings on the main floor.  More volunteers would
be useful with full on drywall beginning very soon.

Further down the road
The siding team could get started.
The cement pads can be poured outside.
We could use some space somewhere to pre paint the trim.

Materials/Tools
All good until we rent drywall lifts and screw guns, now rented and in use

Food and Drink
As per drywall start up schedule
Many thanx to our food teams

Inspections
Vapour barrier on the ceilings this week.

My thoughts
It is amazing how people come through for us out of nowhere.  As well how our troops
instantly change from the plan and roll with sudden changes. Many THANX  to you all.