Construction Daily Log, Patty Parsons Build: Done

Date: September 7, 2011

Rob Abbott reporting

On Site:
Volunteers: Rob Abbott
Visitors: None; nigh, nary even a Willy nor a Nan.

Daily Log: I spread out and raked the trailer-load of topsoil and opted to sow a mixture of
creeping red fescue rather than wild oats.

Ellen: Arrange for contractor to install eavetrough and garbage bin for 1014.
Homeowner: Keep seed damp.
Rob: Expense report.

Next Days/Week Plan:
Except for the eavetrough (by others) and possible warranty work, I think that's the Patty
Parsons Build completed!

Materials/Tools:
I picked up topsoil and seed on my way to site this morning.

Inspections: Final grading once seed has taken.