Daily Log: Nov. 15, 2010 Patty Parsons Build in Bala
VOLUNTEERS:

SITE SUPERVISOR HOWARD RUTTAN
NAN ALLEN, JIM PARTRIDGE, CHRIS BURGESS, TONI GREEN, LEE __ , PETER HEMMING.

CONTRACTORS: MIKE MAHIEU M& M CONTRACTING 


  • FINISHED SANDING 1014 TODAY AFTER WORKING ON SUNDAY AS WELL. ALL MUDDING IS NOW COMPLETE EXCEPT AROUND ELECTRICAL PANELS AND STAIRWELL IN 1014. VOLUNTEERS WILL COMPLETE THIS WORK. 
  • LAWRENCE SEEHAVER FROM SEEHAVER CONCRETE WORKED ON PARGING WALLS ALL DAY. THIS IS MAJOR!!!! HE WILL RETURN TOMORROW TO COMPLETE PARGING.

ACTIVITIES


  • TONI, LEE AND CHRIS PAINTED WALLS AND TRIM  ALL DAY.
  • JIM AND PETER CUT AND INSTALLED TRIM   
  • IAN WALLACE CAME BY AND PICKED UP MDF TO CUT AND ROUTE SILLS FOR 1014.
NEXT

  • ALL HANDS ON DECK FOR CLEAN-UP TO PREP FOR WALL AND TRIM  PAINTING AS WELL AS FLOORING INSTALLATION THIS WEEKEND.
  • LOTS OF PAINTING OF TRIM, WALLS AND FLOOR TO DO. (NOTE THAT 1014A PAINTING IS COMPLETE DUE TO HARD WORK BY TONI AND CREW).
  • AS A RESULT OF THE DEPTH OF PARGE NEEDED DUE TO LATH WE WILL BE OBTAINING MORE PRE MIX PARGE TOMORROW AM.

NOTE

WE HAVE AN ABUNDANCE OF VOLUNTEERS FOR TRIM INSTALLATION ( PROBUS, LAKESHORE CONTRACTING, LEE FROM ROYAL LEPAGE, IAN WALLACE AND VOLUNTEERS THAT HAVE BEEN INVOLVED ALL ALONG, ETC.

HOWEVER, THE TRIM INSTALL CANNOT ALL BE DONE AT ONCE (WE ARE DOING SOME BEFORE FLOOR INSTALL AND SOME AFTER FOR INSTANCE). MUCH OF IT STILL  HAS TO BE CUT AND PAINTED.  SO I WILL BE SCHEDULING AVAILABLE INSTALLERS ON A CASE BY CASE BASIS AS THE WORK AND THE CANDIDATES ARE AVAILABLE. AS A RESULT WE MAY NOT BE ABLE TO USE ALL THE TRIM VOLUNTEERS. 

~HOWARD RUTTAN              