Monday, September 20, 2010

A beautiful day in the neighbourhood

Patty Parson's Build Daily Log

Date:Sept. 17

On Site:  Frank J. Fraser
             Site Supervisor

Volunteers:  Nan Got us going in the morning. Rob Abbott,  Mike Robbins, Brian Ternaway,Bob McDevitt, Carol & Steve Donaldson, Alan Diplock, Peter Cross, Bruce Kelly, Willy.

Visitors: Bruce Kelly from Dupont Tyvek dropped in to demonstrate the proper application of Flex Rap and assisted in the application.


Daily Log: We could not have asked for a better day today. The weather was bright and shiny. The group of people set to task and achieved all tasks put to them to prep the window and door opens for tomorrow. Great job.  Started installing the Tyvek from Dupont. Application of the exterior foam on lower half of the houses. All but finished the application of concrete board on the lower part of the houses. I think we were short 2 pieces to complete the job. We are now fully prepared for the windows tomorrow.


Action / Follow up Items :
PS. Still no plumber. Spoke to their office on Wednesday still hoping the will  come on Saturday

Next Day / Week Plan: Build frame for knee wall in basements Finish Tyveking  and foam  on upper part of peek walls . 2 pieces of concrete left to do.  Then onto insulation and dry wall. Additional framing for the roof that was missed.  Check beam lamination,

Volunteer Requirements: lots of projects for Volunteers.

Materials / Tools : need Hammer drill and more drills for installation of framing for knee wall, concrete board, drills for drywall.